Your Work Shapes the World at Caterpillar Inc.
When you join Caterpillar, you're joining a global team who cares not just about the work we do – but also about each other. We are the makers, problem solvers, and future world builders who are creating stronger, more sustainable communities. We don't just talk about progress and innovation here – we make it happen, with our customers, where we work and live. Together, we are building a better world, so we can all enjoy living in it.
Why you want the job and why it’s awesome!
At Caterpillar’s Indonesia Batam, we manufacture Hydraulic Shovels products used in building the infrastructure and mining to move materials that makes a better world. As an Engineering Change Coordinator at Caterpillar Indonesia Batam, you will be accountable for overall Engineering Changes (including New Product Introduction batch release) management from engineering release to successful implementation at the shop floor to ensure the customer always gets the right product with the best quality.
Additional Info:
Shift: Regular
Work Location: Batam, Kepulauan Riau
Travel Requirement: None
You will work both in an office and manufacturing shop-floor environment.
What You Will Do:
- Identify the areas affected by engineering change.
- Understand the urgency of change, have a line of sight to new material, understand the cost of new material and rework, and the number of parts to be reworked.
- Develop a strategy to support the assembly line prior to the new change availability and communicate as needed to the line foreman, assemblers, planners, and material storage control person.
- Contact the Material Planner of the part that is being exhausted, scrapped, or reworked to determine how much material is committed to and how much inventory is on hand for first operations changes.
- Prior to implementation, verify that schedules are in Material Requirement Planning and old change level is exhausting to zero. Change effective date as needed.
- Reevaluate strategy and confirm effective dates and serial/sequence numbers are correct and ensure that all material has been reworked or new change level material has arrived and is back on the assembly line/in location.
- Depending on complexity: be on the line the day of implementation.